Working principle
Photovoltaic power generation, energy storage battery and power grid supply power to load (charging pile) according to the instruction of background energy management system EMS.
According to the output condition of photovoltaic power and battery, EMS automatically assigns each output of the power supplies. When their power is insufficient, power grid will supplement.
When the load demand is insufficient, photovoltaic panel will charge the battery and discharge the electric to the power grid.
When off-grid, photovoltaic panel and battery supply power to the load.
Features:
The first former battery without dismantling luminous energy storage applications.
Hybrid system battery cluster system integration design and BMS compatible solution.
Intelligent Algorithm of EMS.